Only 2 - 3groundstaff to deploy (8 -10 min match day staff)
10 min deployment(same time when retracted).
No leakson the playing pitch or surrounding pitches.
Mow, roll and marktasks underneath the elevated cover at any time, irrespective of the weather.
LED Advertisingon the elevated cover (return on investment).
Elimination of sweat and moldas seen with conventional flat covers.
Ability to fully securearound the perimeter with fabric flaps end on.
Easy dissipationof rain from raised ramps into nearby drains.
Secure and taut coverwith diagonal cables throughout the middle and weighted water bladders/containers
Further tensioning providedby the stay attached to the poles, and sandbags/weighted plastic feet.
Quick scissor lifts deploymentfor the ability to cover a whole oval field
Wind teststo EU Code standards.
Various heights availableto cover the block through underground hydraulics.
Natural airflowis available at any time.
Further monitoringwith 24/7 iPad access of the temperature, moisture, wind, frost and rain level.
Leading inflated tubesas endorsed by Cricket Australia/Cricket Victoria
FOOTBALL/RUGBY/LEAGUE/AFL/NFL
The AWS RAPID will offer your stadium the ability to:
2 - 3 mengroundstaff operation.
15 min approx deployment(same time when retracted).
Mow, roll and mark tasksunderneath the elevated cover at any time, irrespective of the weather.
LED Advertisingon the elevated cover (return on investment).
Elimination of sweat and moldas seen with conventional flat covers.
Ability to run water offthe sides and into the drains with velcroed fabric.
Secure and taut coverwith diagonal cables throughout the middle and weighted water bladders/containers.
Further tensioning providedby the stay attached to the poles, and sandbags/weighted plastic feet.
Assurances of no obstaclesaround, vital for health and safety.
Wind testingto EU code standards.
Encouragement to grow grassstraight away as the soil has been heated overnight in the winter (by 10-13 degree degrees minimum) to a set timer.
No excessive heatingfrom the set timer fans overnight as natural air comes through at all times.
Natural airflowis available at any time.
Further monitoringwith 24/7 iPad access of the temperature, moisture, wind, frost and rain level.
Leading inflated tubesas endorsed by Cricket Australia/Cricket Victoria
2 - 3 mengroundstaff operation.
15 min approx deployment(same time when retracted).
Mow, roll and mark tasksunderneath the elevated cover at any time, irrespective of the weather.
LED Advertisingon the elevated cover (return on investment).
Elimination of sweat and moldas seen with conventional flat covers.
Ability to run water offthe sides and into the drains with velcroed fabric.
Secure and taut coverwith diagonal cables throughout the middle and weighted water bladders/containers.
Further tensioning providedby the stay attached to the poles, and sandbags/weighted plastic feet.
Assurances of no obstaclesaround, vital for health and safety.
Wind testingto EU code standards.
Encouragement to grow grassstraight away as the soil has been heated overnight in the winter (by 10-13 degree degrees minimum) to a set timer.
No excessive heatingfrom the set timer fans overnight as natural air comes through at all times.
Natural airflowis available at any time.
Further monitoringwith 24/7 iPad access of the temperature, moisture, wind, frost and rain level.
Leading inflated tubesas endorsed by Cricket Australia/Cricket Victoria
COST EFFECTIVE
The AWS RAPID offers long term solutions by providing:
Affordable world class hydraulicswith low annual service fees every 6 to 12 months by your local Parker Hydraulics store.
No excessive costs- with daily power/fan bills per hour in other products, eliminated by Aggreko heaters (with set timers) and hydraulics aiding aeration.
No ongoing costs- minimal labour required through short deployment times.
Durable, tough wearingaluminium lightweight tripods from Australasian leaders Ullrich Aluminium.
Wind tested and strength approvedshelter covers from global distributor Hagihara Plastics. Minimal repair costs.